Accessibility Links
  • Job reference: RMS0116877

Controls Manager

  • Sector: Oil & Gas
  • Location: South Korea
  • Job type: Contract
  • Date posted: 21/11/2012
  • Time left:
    d h m s
    (28/11/12)
This vacancy has now expired.
Send jobs like this to my email    What's this?
The Company:
Our Client is an International Oil and Gas Operator involved in 2 of Australia's largest LNG Projects based in Western Australia.

The Role:
• Responsible for coordinating overall cost control, planning, scheduling, risk analysis, change management, status reporting and analysis to provide the Site Manager with the necessary insight to efficiently plan and manage ongoing activities and accurately predict contract outcomes. Supervise a team of 15 project controls personnel.
• Review, approve, monitor and analyse schedule and progress and reporting of Fabricators activities, forecast deviations and advise the Site manager on mitigation / recovery measures.
• Liaise with the Contracts Team to generate monthly cost reports and assessments and provide forecasts and phasing for Commitments, VOWD, cash calls and FFC. Monitoring and analysis of Fabricators cost systems and reports. Monitoring and reporting of site services contracts.
• Develop and manage the site reporting systems and prepare regular reports for reporting to Perth as per project requirements
• Participate in the site management team regarding management of the site IIF culture. Regularly visit the site to promote management visibility in leading the IIF, quality and cleanliness initiatives
• Liaise with the Singapore based Management and Transportation team on a regular basis to ensure site actions are aligned with project requirements and support project directives and procedures.

Essential Skills / Qualifications:
BSc preferred
15 years minimum, preferably 20+ with at least 5 on fabrication yards
Must have managed a large Project Controls team, extensive background in cost and schedule on major projects, experience of both client and contractor roles, excellent communication skills both written and verbal, good team player.
Similar jobs
Krystal Crofts
Project Planner Location St. Neots, Cambridgeshire Duration long term The Role: The Role: The planner's role is to manage the...
Adam Stamper
Flowline Installation Engineer Location Perth, Western Australia Duration 18 months The Role: The Flowline Installation Engineer supports the...
Raafat Kassem
Project Controls Lead Location Kitimat, British Columbia Duration 1 year The Role: Establish and implement project controls including...

Back to Top

By clicking "Save" you consent to
receiving matching jobs based on the
job/page you are viewing by email from
Fircroft, as detailed in our privacy policy