Accessibility Links
  • Job reference: RMS0109867

ICT Commissioning Team Leader Utilities / S&L

  • Sector: Oil & Gas
  • Location: Perth
  • Job type: Contract
  • Date posted: 02/05/2012
  • Time left:
    d h m s
    (09/05/12)
This vacancy has now expired.
The Company:
Our Client is an International Oil and Gas Operator involved in 2 of Australia's largest LNG Projects based in Western Australia.

The Role:
During the Commissioning preparation phase, phase 4b, will have no reports During Commissioning execution phase, phase 4c, leads a team of 6 commissioning engineers (3 BTB positions) Key responsibilities For the LNG PROCES facilities:
• During phase 4b, lead the development of Company strategies and plans to ensure overall readiness for the execution of pre-commissioning and commissioning activities in both module yard . Review contractor submissions of commissioning strategies and plans for alignment therewith.
• During phase 4b, lead the Company review of Commissioning plans; manuals and procedures, to assure feasibility and alignment with Company Governance.
• During phase 4c, provide direction to the Commissioning group such that the delivery of the commissioning scope is effective, in compliance with agreed procedures, to the correct quality, and as per schedule. Both in the module yard.
• During phase 4c, assure Commissioning team compliance to the Commissioning HES plan, in particular to management of Simops, safeguards and overrides and Log Out / Tag Out procedure application
• During both phases 4b and 4c, provide input to the Engineering scope in respect to commissioning requirements. Assure compliance to Management of Change protocol for close out of Non Conformances and Changes identified during phase 4c
• Manage the Handover of the LNG PROCES facilities to the asset operations team
• Assure timely progress reporting and pro-active initiation of recovery measures where progress is behind plan
• Lead the identification of potential Commissioning risks and the implementation of mitigation plans
• Assist in the development and execution of the IFF program.

Essential Skills / Qualifications:
Degree or diploma qualifications in engineering or related disciplines would be desirable.
• Site/field Experience in respect commissioning activities utilities/hydrocarbon facilities
• Head Office Experience in respect commissioning/start-up/operations
• Experience of Contractor management head office/field
• Experience with oil major in owner in commissioning role
• Experience of handover management and or tools (Win PCS etc)
• Experience of modular build approach
• Work experience with fabricators such as Hyundai etc
• Work experience in Australia
• Commissioning management experience in major project
This position will work closely with contractor commissioning teams and design teams.In depth operating and technical experience is required in LNG and Storage, Loading, and Operations. The integrated upstream and downstream LNG and Domgas plant, is technically complex. The operations are located on a class ‘A’ nature reserve and surrounded by a marine conservation ar
Similar jobs
Gary Chapman
Turnover / Systems Completions Advisor Location: Kazakhstan Duration: 12 months The Role: 28/28 rotation Provide coordination and...
Gary Chapman
Commissioning Process Engineer Location: Iraq Duration: 12 months The Role: Working under the guidance of the discipline leads...
Sanaullah Syed
Commissioning Engineer / Supervisor - Electrical Location: Saudi Arabia Duration: 2 years The Role: PURPOSE: This position is accountable for the...

TOP