Accessibility Links
  • Job reference: RMS0139089

Installation Engineer

  • Sector: Oil & Gas
  • Location: Ulsan
  • Job type: Contract
  • Date posted: 06/03/2014
  • Time left:
    d h m s
    (21/03/14)
This vacancy has now expired.
The Company:
A major Oil and Gas operator for an Offshore project and the Tension Leg Platform package of the project.

The Role:
The Job Holder responsibility is to participate and follow-up Installation Engineering, Pre-Installation operations and Installation operations of the TLP and the TLP/STAD mooring system for Moho Nord field, with the aim of remaining within the agreed budget, schedule for completion and statement of requirements.
As such, the job holder’s main activities are to:
- Participate in detailed engineering phase and execution phase up to the installation of the TLP and the hook-up of the mooring system.
- Identify reasons for potential contract cost increase and/or work time schedule slippage and propose remedial actions.
- Manage interfaces and maintain close coordination with others: Drilling, FPU, UFR, Operations and other required interfaces.
- Oversees all installation subcontractors’ activities to ensure that all technical, contractual and cost information are properly recorded, collated and available for inspection/reference as required by law/regulations and Company policies.
- Participate with commissioning team in pre-commissioning and commissioning activities of the TLP marine systems at yard before sailaway
- Follow-up of TLP preparation at yard before sailaway (preparation and commissioning of installation equipment / pre-rigging)
- Participate in offshore activities from float-on in South Korea to offshore Congo and report on a daily basis of the on-going activities and potential offshore schedule slippage.
- Follow-up all installation activities of the mooring system, the tendon system, the conductor pipes and the TLP offshore Congo.
- Liaise with other installation team members (engineers, vessel representatives, diving supervisors, etc...), as required.
- Keep TLP Installation Manager regularly informed of progress, main events and decisions, and of possible impact on overall project strategy.

Reporting to TLP Installation Manager
Location: Ulsan (Korea) to beginning of 2015, with missions to Congo (onshore and offshore), The Netherlands, Paris and other sites
Starting date: April 2014
Duration: 12 months renewable

Essential Skills / Qualifications:
10 years minimum experience at similar position and similar Oil and Gas Project.
Offshore experience with floating unit installation, mooring system installation
Perfect understanding of the Contractual relationships between Company and all Contractors in a versatile working environment.
Good knowledge of International norms and regulations.
Master degree (Engineer) from University or equivalent.
Fluent English.
Similar jobs
Adam Stamper
Subsea Engineer - Manifold & Tie In Location: Perth, Western Australia Duration: 22 months The Role: Position Summary The subsea hardware engineer is...
Adam Stamper
Subsea XT Engineer Location: Perth, Western Australia Duration: 22 months The Role: Position Summary The subsea hardware engineer is...
Gary Chapman
GSS Services Supervisor Location: Azerbaijan Duration: 12 months The Role: The GSS Services Supervisor will support the GSS...

TOP