Accessibility Links
  • Job reference: RMS0146396

Intergrated Activity Planner

  • Sector: Oil & Gas
  • Location: Ireland - Other
  • Job type: Contract
  • Date posted: 18/08/2014
  • Time left:
    d h m s
    (04/09/14)
This vacancy has now expired.
The Role:
• Prepare and maintain the Asset Integrated Activity Plans for relevant installations with rigorous application of the IAP processes and system to enable successful and safe delivery of all functional activities.
• To act at all times in accordance with the Policy on Health, Safety and Environment and provide assurance activities accordingly.
• In conjunction with the Functional Planners, to combine, integrate and optimize the multi-functional plans within the Asset in order to prepare the short-term (90-day) and very-short-term (28-day) Area Integrated Activity Plans for the installation(s).
• To manage the Asset monthly ST & VST Integrated Activity Planning meetings and associated process to ensure the optimal delivery of Asset plans.
• In conjunction with the asset and Functional Planners, to combine, integrate and optimise the multi-functional plans within the Asset in order to prepare the medium-term (two year) Area Integrated Activity Plans for the designated installation(s) and maximise the Business outcomes (Production and Cost) within the prevailing resource constraints (onshore/offshore resources).
• To support the Senior Asset Integrated Activity Planner (Team Leader) at the Asset medium-term Integrated Activity Planning meetings and deputize where necessary.
• Provide an assessed response by analyzing, diagnosing and using professional judgment in the planning, monitoring and reporting of the Asset Integrated Activity Plan.
• Provide contingencies and risk based assessment options for management consideration and decision making.
• To effectively apply the activity change management process to achieve optimum stability of Asset plans and to ensure that the impact of changes are fully assessed up-front and effectively communicated to all stakeholders.
• To liaise with the Functional Planners for your installations to ensure the effective delivery of the integrated planning process and the timely delivery and quality of activity planning data.
• To maintain the Asset TAR (turnaround) planning window timings, critical path and other data in the Planning System for the designated installations.
• To ensure the quality of Functional data and its compliance with the agreed Plan Entry Criteria (PEC) for the designated installations.
• To prepare an analysis of actual planning performance data and KPIs in order to identify areas for continuous improvement and to prepare and to present findings at monthly Planning meetings. Proactively support asset leadership team towards key decision making within appropriate timeframes.
• To liaise with the Asset Production Programmers to identify production deferment from activities on the Integrated Activity Plans in support of the production optimization process.
• Ensure alignment with Asset ORIP Process and key asset risks are addressed correctly within the IAP.
• Ensure close cooperation with Logistics teams to ensure the most effective and cost efficient deployment of resources is maintained.
• Prepare output of ARP, MRP and FAPs for updating asset Workload Assessment Models To audit plan data and ensure alignment with company annual business plan process Ensure asset and functional teams fully comply with IAP processes and data quality requirements.

Essential Skills / Qualifications:
• Minimum 5 years experience
• Maintenance planning background
• Integrated Activity Planning experience
• Previous working history with an operator
• Primavera 8.2 exposure ideal but not necessary
• Strong excel skills
• The right individual will be strong, confident and wont be afraid to challenge people.
• The successful candidate will have experience in working in a plant previously
Similar jobs
Sylvanna Berkowitz
COW (Control of work) Planner Location: Toledo, Ohio Duration: 18-24 months The Role: looking for someone experienced in refinery...
Sylvanna Berkowitz
Subcontracts Planner Location: Toledo, Ohio Duration: 18-24 months The Role: Need someone experienced in refinery shutdown...
Sylvanna Berkowitz
Rotating Equipment Planner Location: Toledo, Ohio Duration: 18-24 months The Role: Need someone experienced in refinery shutdown...

TOP