Accessibility Links
  • Job reference: RMS0128191

Senior Commissioning Planner

  • Sector: Oil & Gas
  • Location: Stavanger
  • Job type: Contract
  • Date posted: 09/07/2013
  • Time left:
    d h m s
This vacancy has now expired.
Send jobs like this to my email
The Company:
Assignment description:
Gina Krog is an oil and gas field located 30 km north of Sleipner. Water depths are approximately 116m.

The Gina Krog development comprises a standalone platform for oil stabilisation. The oil is exported to a floating storage and offloading unit (FSO), approximately 2.5 km away, where the oil is off-loaded to a shuttle tanker at suitable intervals. The rich gas is exported to Sleipner, where it is processed. The dry gas is exported to the Gassled system, and the cond

The Role:

Contract Period: Start: 01.09.2013 End: 31.08.2015

Option period: Yes: 2 x 1 Years


• Establish and maintain all schedule documents (in cooperation with all disciplines):
- Input to Project Detailed Schedule (Level 2)
- Interface Schedule
- Detailed Commissioning Schedule (level 4) containing pre-commission, commissioning and start-up.
- Establish RFC dates for systems and sub-systems
- Establish handover matrix plan from commissioning to operation.
- S-Curves and Manpower Histograms
- Input to Project Planning Basis (input to Project Control Basis)

• Establish and perform Schedule Control
- Prepare and implement system for schedule control (progress, schedule indicators and float development)
- Weekly update of progress for Level 4 network and Level 5 job cards
- Provide progress status and float development reporting in Commissioning.
- Critical path analysis
- Follow up and ensure active steering of targets, milestones, critical path and risks by identify and propose mitigating actions.
- Follow-up MC handover matrix plan to commissioning.
- Communicate plans, targets and status to project members

• Handling of schedule interfaces
- Build good relationship with Vendors and Contractors. Work closely with Operation during execution.
- Facilitating between the various project areas to ensure an optimal use of time and money
- Monitor and secure proper float between schedule interfaces.

• Schedule Risk
- Provide input to the risk management process
- Evaluate risk issues with possible schedule effects and be involved in defining the mitigation measures and evaluating their potential success.

• Schedule Revision/ Management Document Revision:
- Weekly and Monthly reporting. Contribute in baseline updates (CCS) and give input to budget.
- Schedule change control (project changes and variations). All changes shall be evaluated with possible schedule effects and be involved in evaluating their potential success.

• Close-out
- Facilitate the exchange of and utilise experiences and benchmarking with other projects internally
- Prepare experience transfer feedback to templates and governing documents

Active leadership in planning discussions with project management, the project organisation and contractors.
The planning function shall be proactive in schedule analysis, providing management with schedule consequences related to delays, productivity, changes etc. and propose mitigating and corrective actions in order to ensure a timely project development.

High focus on HSE, ethics and my clients values
Well-developed teambuilding, co operational- and communication abilities
Structured, systematic and target driven with well defined goals
Multidiscipline understanding and ability to work ‘across’ all areas in the project
Ability to handle responsibility and periodically high work loads

Essential Skills / Qualifications:
Competence requirements:
Minimum 8 years of experience from project development/execution (within project execution, completion and commissioning)
Knowledge of my clients governing documentation is an advantage
Experience working with contractors
Knowledge in planning tools (preferebly Safran tools)
Workplace: Onshore, Kuala Lumpur
The role will be located in Kuala Lumpur, Malaysia from start until midyear 2014 and will then move Stavanger, Norway.
The applicant must be willing to travel to South Korea from time to time.

Candidate(s) nominated to the above position(s) may be considered relevant for similar position(s) in other international projects.

Language requirements (if essential for the work):

Work percent: 100%

Rotation: No
Similar jobs
OSS Production Planner Location Perth CBD, Western Australia Duration permanent The Role: The Production Planner is responsible for planning...
Scott Thorburn
Lead Production Scheduler Location Billingham, County Durham Duration permanent PURPOSE OF THE JOB: Provide an effective production planning...

Back to Top