Accessibility Links
  • Job reference: RMS0159668

Site Assistant

  • Sector: Commercial
  • Location: Geoje
  • Job type: Contract
  • Date posted: 30/07/2015
  • Time left:
    d h m s
    (06/08/15)
This vacancy has now expired.
Send jobs like this to my email    What's this?
The Company:
Our client is a global, pioneering operator with continued growth in Australia developing large gas resources and maintaining a substantial exploration portfolio. Our client has over 90,000 personnel worldwide across 70 countries making them one of the largest oil and gas operators in the world. Our client is also involved in ground-breaking projects the likes of which the world has never seen before thus confirming their reputation as an innovator in oil and gas technology.

The Role:
"Floating LNG is a technology First. It is an important development for Shell and the LNG industry as it reduces both the project costs and environmental footprint, thereby providing the potential to unlock stranded offshore gas reserves. It precludes the need for long distance pipelines and extensive onshore infrastructure. There are currently no FLNG facilities deployed anywhere in the world.

The broad operating parameters of the design mean it can be redeployed. The standardised “design one, build many” approach allows material repeatability gains to be captured during design and construction phases.

In July 2009, Shell awarded a consortium of Technip and Samsung Heavy Industries the contract for the design, construction and installation of multiple FLNG facilities over a period of up to 15 years, based upon Shell’s proprietary design.

The FLNG facility itself will be approximately 480m long and 75m wide, and would be moored at the gas field location during the period of production. It would stay on station permanently during the operations phase, even during cyclones, and has been designed to withstand a 1 in 10,000-year weather event.

The first of these facilities will be deployed at the Prelude FLNG Project in the remote Browse Basin, 475km north-northeast of Broome, Western Australia. The Prelude project is currently in the EXECUTE phase with the FLNG team located in Technip offices in Paris and Kuala Lumpur as well as the Samsung shipyard yard in Geoje where the FLNG facility will be built. The FLNG turret and mooring is based in Monaco while the Subsea team is based in Kuala Lumpur and the Wells team based in Perth. FLNG facility start-up is planned for 2016.
"
Similar jobs
Krystal Crofts
Administrator Order Entry Location Coventry, West Midlands Duration 12 months + The Role: Working hours are Monday to Friday - 8 hours per...

Back to Top

By clicking "Save" you consent to
receiving matching jobs based on the
job/page you are viewing by email from
Fircroft, as detailed in our privacy policy
Fircroft would like to keep you up to date with our current vacancies and latest company updates via email. Occasionally Fircrofts marketing may contain 3rd party or affiliate information, however we will not share your personal data with any 3rd parties without your consent. From time to time, we might contact you to get your views on the service you have received. To help you get the best out of Fircroft, we may personalise them based on your location and how you use fircroft.com
Fircroft would like to keep you up to date with the latest company updates and vacancies via SMS / Text messages
Your consent options above means that Fircroft cannot contact you about any new or alternative career vacancies. If you want Fircroft to only contact you about the role(s) you have applied for please continue, however if you would like to be considered for other positions please allow us to contact you by changing one or more of the above consent.