Accessibility Links
  • Job reference: RMS0116323

Sr. Production Reservoir Engineer/Technologist

  • Sector: Oil & Gas
  • Location: Ho Chi Minh City
  • Job type: Contract
  • Date posted: 21/09/2012
  • Time left:
    d h m s
    (28/09/12)
This vacancy has now expired.
Send jobs like this to my email    What's this?
The Company:
An established E&P company in Vietnam who is currently producing and developing new assets.

The Role:
The incumbent will work in a subsurface multi-disciplinary team that provides technical input into field evaluation, reservoir management, production optimization and field development planning.

-Be an integral part of the team which formulates the Reservoir Management strategy for the different fields and sub-blocks. Responsible for collection of accurate production, pressure and other data to execute the Reservoir Management strategy.
-Formulate the production strategy for all development wells. Responsible for execution of the strategy through liaison with Production Department.
-Develop procedures and plans for well monitoring, production analysis, well surveillance and production optimization.
-Identify any sub-optimal production wells and decide on appropriate action(s) to increase well productivity e.g. additional perforations, stimulation, water shut-offs, etc.
-Work closely with other departments on related well completions (with Drilling Department), on well intervention operations and on surface system optimization (with Production Department).
-Fully responsible to provide all Production Technology input for preparation of Field Development Plans.
-Share experience with other subsurface team members.
-Mentor and knowledge transfer to the local Production Reservoir Engineer.

Essential Skills / Qualifications:
Possess a Bachelor Degree, ideally in petroleum/ production/ reservoir engineering, with an MSc preferred. Significant experience in well and reservoir management, well surveillance, production optimization and well intervention operations. The candidate should have experience in well performance enhancement techniques including stimulation, re-perforation, artificial lift and water shut-off techniques. Experience with multi-stacked sandstone reservoirs and with water injection operations is required.
- Production Technologist with a minimum of 10 years related experience.
- Thorough understanding of well monitoring techniques and well production enhancement, such as water shut-off, PLT/ MPLT analysis, stimulation, etc.
- Sound understanding of well completion, artificial lift (especially gas lift) and surface systems, and a sound knowledge of petroleum engineering.
- Working knowledge of slickline, electric wireline and coiled tubing operations.
- Knowledge of integrated fiel
Similar jobs
Scott Thorburn
Well Plug & Abandonment Engineer - Decommissioning Location Norwich, Norfolk Duration 12 months The Role: This is a great opportunity to become an integral...

Back to Top

By clicking "Save" you consent to
receiving matching jobs based on the
job/page you are viewing by email from
Fircroft, as detailed in our privacy policy
Fircroft would like to keep you up to date with our current vacancies and latest company updates via email. Occasionally Fircrofts marketing may contain 3rd party or affiliate information, however we will not share your personal data with any 3rd parties without your consent. From time to time, we might contact you to get your views on the service you have received. To help you get the best out of Fircroft, we may personalise them based on your location and how you use fircroft.com
Fircroft would like to keep you up to date with the latest company updates and vacancies via SMS / Text messages
Your consent options above means that Fircroft cannot contact you about any new or alternative career vacancies. If you want Fircroft to only contact you about the role(s) you have applied for please continue, however if you would like to be considered for other positions please allow us to contact you by changing one or more of the above consent.