Accessibility Links
  • Job reference: RMS0170403

Turbine and Boiler Superintendent - Power Plant

  • Sector: Power & Energy
  • Location: Cambodia
  • Job type: Permanent
  • Date posted: 12/08/2016
  • Duration: 2 years
  • Time left:
    d h m s
    (28/09/16)
This vacancy has now expired.
The Role:
The 2 x 50 MW CFB power station located in Kampenh, Preah Sihanouk, Cambodia situated 30 minutes from Sihanoukville. The plant has been in operation since December 2013 and the personnel would be working for the Owner.
It is expected that the interview take place during October2016, with the new staff mobilising to site during November 2016.

Reporting to: General Manager/Plant Manager

Responsible for coordinating operations activities, to coordinate with the Maintenance department, troubleshooting and to provide leadership to the plant operators.
Monitor plant performance and ensure equipment is operated in compliance with the operating standards and procedures.
Review shift reports and operating records, report abnormalities to the Operation Manager and ensure corrective action is taken.
Conduct regular plant inspections and review and monitor the operators’ inspection records.
Supervise and coordinate the daily operation of the section.
Coordinate with the Technical Department to ensure compliance with quality and environmental standards.
Similar jobs
EPPC Field Service Technician Location: Coventry, West Midlands Duration: permanent The Role: To deliver and lead site based projects including...
Yasmine Al-Noah
Service co-ordinator Location: Stone, Staffordshire Duration: temp - perm The Role: Our client is looking for an experienced Service...
Kate Walker
Circuit Engineer Location: Stone, Staffordshire Duration: permanent The Role: * Manage the design deliverables assigned and...

TOP